Skip to content
ArchiWorking
ArchiWorking
Primary Navigation Menu
Menu
  • English
    • Français
    • English
    • Español
  • Home
  • Our articles
    • Finishes & materials
    • Renovation & design
    • Floor plans
    • Real estate
    • FAQ
    • Tips & tricks
    • Outdoor & garden

Architect tips

Advice from an interior architect is key to a successful renovation or remodel. A professional brings a global vision that takes structure, light and circulation into account before placing a single piece of furniture. On the projects we support, the first step is always technical: locating plumbing and electrical, available windows, load-bearing walls and regulatory constraints. That framework is what makes the right architectural decisions possible. On a 38 sq ft (3.5 m²) bathroom with 1970s radiant floor heating, for example, this survey led us to compare three scenarios before choosing the only layout that kept 28 in (70 cm) of usable clearance.

Renovation advice from an interior architect: method, constraints and planning ahead

A renovation starts with an accurate survey of existing conditions: water supply, drains, plumbing stacks, load-bearing walls, ceiling height and daylight in each area. This assessment drives everything else. A plan drawn without it almost always leads to costly surprises during construction. The interior architect also anticipates regulatory constraints: condo or HOA rules, local zoning and the permits required by the scope of work. When a project involves opening a load-bearing wall, adding a glass partition or moving the kitchen, a structural study and close construction follow-up keep the plan and the build aligned. In one apartment where the kitchen was moved next to an existing plumbing stack, this planning freed up more than 100 sq ft (10 m²) and created an extra room within the same footprint.

Optimizing space, light and circulation: the decisions that change everything

On every project, a few precise decisions make the difference between a functional interior and a truly finished one. A minimum of 28 in (70 cm) of clear passage everywhere, aiming for about 3 ft (1 m) whenever possible. Lighting treated as its own plan, with three layers: ambient, task and accent. A hierarchy of spaces based on available daylight. Storage built into the plan from the start, not added later. These early trade-offs, made on paper, prevent costly rework and poorly configured spaces that last for years. Find these methods applied in our floor plan design case studies.

These design decisions naturally extend to storage solutions: explore our case studies in the walk-in closet and custom furniture section.

Layout plan How to lay out an 84 m² T2 to create 6 functional spaces out of 3?

Fitting Six Functions into an 84 m² T2

2026-10-28
By: Archiworking
On: 28 October 2026
In: Floor plan design

A large one-bedroom apartment is not necessarily an easy home to use. This approximately 84 m² property began as a garage and was legally converted to residential use. Its unusual volumes offered generous space, yet the arrangement no longer suited a couple who needed a clearer distinction between home life and working from home. The owner also uses the property for a coaching activity and occasionally receives clients there. The brief was therefore about more than fitting additional furniture. Arrival, visiting clients, private sleeping space and everyday domestic tasks needed a more deliberate relationship. In this ArchiWorking study, Clara and Mathieu reorganize the measured 84.36Read More →

8 solutions for creating a WC drainage outlet?

Adding WCs in a House: Drainage Connection Options

2026-09-04
By: Archiworking
On: 4 September 2026
In: Tips & tricks

Adding a toilet is often a drainage problem before it is a room-planning problem. Finding enough space for the bowl does not establish that waste can reach a suitable connection. The route, available fall, pipe size and ventilation determine whether the position is workable. A distant drain does not necessarily rule the project out. Depending on the building, a pipe may travel below the floor, inside a technical enclosure, within a raised floor or through a new vertical stack. Where gravity drainage cannot reasonably be achieved, a macerating pump may provide another route, subject to its limits and local requirements. The eight strategy families belowRead More →

Quand le vide agrandit la perception de l’espace

How to Design an Interior That Breathes: The Role of Empty Space in How We Perceive a Room

2026-06-26
By: Archiworking
On: 26 June 2026
In: FAQ renovation & design

Empty space is a design tool. How to keep it with smart storage, when to remove partitions and how to tell if a room is overfurnished.Read More →

Wide passages and smooth clearances Zero threshold = everyday safety Accessible switches and sockets to 130

Accessibility Standards in Renovation: What Is Mandatory, What Is Advised and How to Plan Ahead Without Losing Space

2026-06-24
By: Archiworking
On: 24 June 2026
In: FAQ renovation & design, Real estate

French PMR accessibility rules, what applies to private renovations, three client profiles and how to design an adaptable home without losing space.Read More →

ADD AN ENCLOSED TERRACE TO THE MASTER SUITE Bedroom 2.75 m² bathroom Closet office

Closing a Loggia to Expand a Master Suite: 86 sq ft Reclaimed in an Apartment. Floor Plan, Bathroom and Walk-In Closet

2026-06-11
By: Archiworking
On: 11 June 2026
In: Renovation & design

Closing an 86 sq ft loggia and integrating it into a 101 sq ft bedroom to create a 213 sq ft master suite in an apartment, this is the project we’ll walk through in full, from the first floor plan to the completed build. The operation requires no work on the load-bearing walls. It follows a rigorous architectural method, from reading the existing plan through to final finishes. For other examples of master suite conversions, see our detailed project of a primary suite design: layout ideas and expert architectural tips. By Mathieu, Certified Interior Architect (updated June 2026) Closing a loggia in an apartment:Lire la suite…Read More →

suite parentale dans 30 m² dressing et douche italienne salle d'eau

How to Enlarge a Small Bathroom Without an Extension

2026-05-29
By: Archiworking
On: 29 May 2026
In: FAQ renovation & design

Hidden volumes, slimmer linings, compact fixtures, pocket doors and 9 levers to gain space in a small bathroom without touching load-bearing walls.Read More →

3-STEP METHOD ENCLOSED WC IN A BATHROOM A MATTER OF LAYOUT, NOT A QUESTION OF DOORS DEFINE HOW THE VOLUME IS DIVIDED BEFORE

Creating a Separate Toilet in a Compact Bathroom: Method and Solutions

2026-05-26
By: Archiworking
On: 26 May 2026
In: FAQ renovation & design

Minimum 2.5 m², volume first, drains second, door last: a 3-step method to enclose a toilet in a compact bathroom, with a real case.Read More →

ELEVATION – FULL BATHROOM SECTION – A Scale 1:20 NOTES • Indicative ceiling height: 2.50 m • Partition and finish

How to Fit a Pocket Door to Enclose a Toilet in a Bathroom

2026-05-22
By: Archiworking
On: 22 May 2026
In: FAQ renovation & design

Pocket doors free 60 to 80 cm of swing space. Partition thickness, drilling traps, finishes and an 8.5 m² bathroom case study.Read More →

05 bathroom after wide view

Bathroom Window and Overlooking Neighbors: Keeping the View and Light Without Being Seen

2026-05-22
By: Archiworking
On: 22 May 2026
In: FAQ renovation & design

Sightline analysis, fixed glazed panels, frosted glass or film, sill height: how to keep light and view in a bathroom without being seen.Read More →

Work zones & activity triangle Discover the method for a smooth-flowing kitchen. Click to read the article. Interior

The Kitchen Work Triangle: 3 Layout Logics to Know

2026-05-04
By: Archiworking
On: 4 May 2026
In: FAQ renovation & design, Tips & tricks

Classic triangle, linear sequence or island zones: how to lay out a kitchen around real tasks, with distances and island sizes.Read More →

KITCHEN RELOCATED constraints to anticipate

Moving a Kitchen to Gain a Room: Three Constraints

2026-04-17
By: Archiworking
On: 17 April 2026
In: Renovation & design

Moving a kitchen can create an additional room without enlarging the home. In this renovation, the former kitchen became an office and occasional guest bedroom of more than 10 m². The kitchen moved elsewhere, with its new position determined by water connections, electrical routes and the proportions of the shared space. Those three subjects are connected. A location that looks attractive for furniture may be impractical for drainage. A technically convenient location may still leave an awkward living area. The project therefore began with a plan and a coordinated sequence, rather than removing the old kitchen and deciding the replacement position afterward. The recorded workRead More →

dessin projet aménagement

4 Interior Design Mistakes Avoided When Merging Two Units into One House: A Real Example

2026-04-11
By: Archiworking
On: 11 April 2026
In: FAQ renovation & design, Real estate

Circulation, daylight, load-bearing openings and services: four classic mistakes avoided on a 145 m² ground floor merging two homes.Read More →

HOUSE PLAN 145 m² MERGING 2 HOMES

Joining Two Homes into One 145 m² House

2026-04-10
By: Archiworking
On: 10 April 2026
In: Floor plan design

Combining two homes does not automatically create one coherent house. This 145 m² ground floor began as two separate residential arrangements, divided by a substantial central load-bearing wall. Each side had its own habits of circulation, and the larger combined area offered little benefit while those patterns remained disconnected. The brief was a family home with a clear entry, an office, laundry, guest toilet, a generous kitchen with an island, and a connected living and dining area. The task was not merely to remove the boundary between the two units. It was to establish a new way of arriving, moving and living across the wholeRead More →

avant travaux co pro

Interior Works in a Condo with Central Heating: What to Check Before You Start

2026-04-09
By: Archiworking
On: 9 April 2026
In: FAQ renovation & design, Real estate

Moving a shared radiator, hidden risers, floor openings, pre-works condition reports and general meeting votes: what to check before condo works.Read More →

Concevoir une suite parentale méthode, chantier et arbitrages de A à Z

Designing a Parental Suite: Method and Site

2026-04-06
By: Archiworking
On: 6 April 2026
In: Renovation & design

A primary suite is a coordinated program, not simply a bedroom with a shower added beside it. In this 30 m² renovation, sleeping, clothing storage and a private shower room had to work together within the existing area. The project also had to deal with old services, a history of moisture and details that could not be resolved by choosing finishes alone. The work lasted 8 weeks from initial removal to handover. Its value as a case study lies in the decisions made before and during those weeks: identifying a workable minimum program, checking services, coordinating partitions and ventilation, then handling adjustments without losing theRead More →

Suite parentale comment intégrer un WC dans cette salle de bain de 3,8 m² ?

Adding a WC Inside a Small Primary Bathroom

2026-04-03
By: Archiworking
On: 3 April 2026
In: Renovation & design

Adding a toilet to a bathroom of only 3.8 m² did not begin with choosing a smaller bowl. It began with reading the service enclosure, the existing waste routes and the window’s opening movement. Those fixed conditions determined whether the new arrangement could work. The room belonged to a primary suite. It already contained a raised shower tray, bidet and small basin, but the owners wanted a complete renovation, a more accessible walk-in shower arrangement and a private toilet. The challenge was to add that function without blocking the window or sacrificing a useful shower. Our seven checks before bathroom renovation provide the wider preparationRead More →

Pourquoi le chauffage collectif rend certains travaux plus sensibles

Can You Renovate a Condo Apartment When the Building Has Central Heating?

2026-04-02
By: Archiworking
On: 2 April 2026
In: FAQ renovation & design

Private vs common parts, works you can do freely, when the condo board must agree, and what you may discover too late with shared heating.Read More →

A REAL ENTRYWAY created with 3 tips

Building a True Entry in a Flat Without One

2026-03-28
By: Archiworking
On: 28 March 2026
In: Renovation & design

An apartment can have a front door without having a useful entry. If arrival happens directly in the kitchen or lounge, coats, shoes and bags have no clear destination, and the transition from outside to private living space disappears. This renovation created that missing transition through three coordinated moves: furniture that acts as a partial divider, a localized ceiling drop with its own light, and a distinct area of flooring. Together they establish an entry without a new full-height room partition. The central furniture combines clothing storage, a bench and places for daily belongings. The method is about a complete arrival routine, not simply addingRead More →

KITCHEN CHECKS BEFORE THE WORK

Kitchen Renovation: 9 Checks Before You Start the Work

2026-03-20
By: Archiworking
On: 20 March 2026
In: Renovation & design

By Clara AJMAR, interior architect and licensed landscape architect (DPLG) (updated October 2026). Nine essential checks before you launch a kitchen renovation: layout, clearances, work triangle, utilities, budget, storage, lighting, materials and common pitfalls.Read More →

DSC2666 copie

Bathroom Renovation: Seven Checks Before You Start

2026-03-10
By: Archiworking
On: 10 March 2026
In: Finishes & materials, Renovation & design

A useful bathroom estimate begins before tile, faucets and vanity fronts are selected. It needs a clear brief, a workable plan and an agreed approach to the services and concealed construction. Otherwise, two attractive-looking prices may describe very different jobs. ArchiWorking’s seven-point method connects budget, circulation, plumbing, waterproofing, ventilation, the main fixture, materials and everyday comfort. The aim is not to specify a bathroom from an article, but to know what must be resolved before contractors price the work. The examples include a small room under a roof slope and references from French project practice. Those technical and tax references are identified below rather thanRead More →

plan architecte

90 m² Plan: T4 to T5 and a Suite

2026-02-24
By: Archiworking
On: 24 February 2026
In: Floor plan design, Real estate

Creating one more bedroom in a 90 m² apartment starts with reading the plan, not drawing an extra partition. This ArchiWorking study uses sketches and tracing paper to test a French T4-to-T5 conversion: one additional main room within the existing area. The purpose is to recover useful space while retaining a coherent living area. The accompanying plan video shows the design method; the companion before-and-after video presents the finished result: before-and-after project video. For another complete design example, the 105 m² apartment study from tracing-paper sketch to primary suite follows the same concern for overall organization. Read the routes before moving a wall Begin withRead More →

What is the best layout around a pool?

Pool Surroundings: Turning a Pool into a Living Space

2026-02-24
By: Archiworking
On: 24 February 2026
In: FAQ renovation & design

Deck materials and widths, hidden budget lines, drainage, planting, shade and lighting: how to design the area around a pool.Read More →

Pool safety: Legal requirements and solutions

Pool Safety in France: Legal Requirements and the Best Solutions

2026-02-17
By: Archiworking
On: 17 February 2026
In: FAQ renovation & design

The 4 approved safety devices under French law, indicative 2026 costs, discreet integration and penalties for non-compliance.Read More →

BEFORE AFTER ONE EXTRA ROOM

Turning a T4 into a T5 Without Extending

2026-02-11
By: Archiworking
On: 11 February 2026
In: Renovation & design

The extra room in this renovation came from moving the kitchen into the living area. That may seem to reduce shared space, but the plan also recovered two small areas beyond an existing partition. The result was a different allocation of the same apartment, not an extension. The project changed a French T4 into a T5 by creating an additional bedroom. Those classifications count main rooms, not a literal change from four bedrooms to five. The objective was a coherent home with an open kitchen and a complete primary-suite arrangement. Fix the strategy before the partitions Three decisions came first: the extra-room objective, the positionsRead More →

Filtration and water treatment The secret of a crystal-clear pool

Filtration and Water Treatment: The Secret of a Crystal-Clear Pool

2026-02-10
By: Archiworking
On: 10 February 2026
In: FAQ renovation & design

Sand, cartridge or diatom filters, salt, chlorine or UV, indicative French costs and the filtration time rule for clear, healthy water.Read More →

plan appartement 105m2 dessin calque suite parentale entree deportee

Apartment Plan 105 m²: From Sketch to Layout

2026-02-09
By: Archiworking
On: 9 February 2026
In: Floor plan design, Real estate

The transformation of this 105 m² apartment began with drawing rather than demolition. The existing plan was divided into rooms, but the design brief sought clearer circulation, better daylight relationships and a more coherent arrangement of shared and private space. ArchiWorking used hand sketches and tracing paper to test those relationships before fixing the proposal in design software. The method makes the reasons for change visible, not simply the final appearance. Overlay alternatives before committing to one Start with the surveyed condition, including the constraints. A tracing-paper layer can test a route; another can adjust a room’s proportion without losing the original reference beneath it.Read More →

avant apres dressing 3m 4m 1800x900 sansme

Enlarging a Dressing from 3 m to 4 m

2026-02-03
By: Archiworking
On: 3 February 2026
In: Renovation & design

The brief was to increase a closet wall from 3 m to 4 m without treating the whole project as an expensive set of full-height cabinet boxes. The solution combined gypsum-board construction with selected timber joinery, turning a freestanding-looking block into part of the bedroom’s architecture. The existing store-bought wardrobe had usable storage but stopped below the ceiling, looked disconnected from the room and lacked capacity. Its relationship with the bathroom also made circulation part of the redesign. Our closet-planning guide provides the broader starting questions. Build the enclosure, then concentrate the joinery The design recovers the whole 4 m wall. Full-height gypsum-board partitions onRead More →

Planning the equipment room of your pool?

Planning the Equipment Room: The Operational Heart of Your Pool

2026-02-03
By: Archiworking
On: 3 February 2026
In: FAQ renovation & design

Distance, level, noise, ventilation, drainage and the right setup: how to design a pool equipment room that is easy to maintain.Read More →

Choosing your pool structure: Concrete, Shell or Membrane?

Choosing Your Pool Structure: Concrete, Shell or Membrane?

2026-01-27
By: Archiworking
On: 27 January 2026
In: FAQ renovation & design

Concrete, fiberglass shell or reinforced membrane: lifespan, constraints, delivery access, indicative French budget and timelines compared.Read More →

Pools and Planning Rules How to master the rules (PLU, ABF and permits)

Planning Rules for Pools in France: PLU, ABF and Permits

2026-01-20
By: Archiworking
On: 20 January 2026
In: FAQ renovation & design

Declaration or building permit, processing and appeal periods, heritage zones and ABF demands, setbacks: the French rules for a pool.Read More →

Posts pagination

1 2 … 5 Next
  • Mentions légales
  • Politique de confidentialité
  • Consultation avec un architecte d’intérieur en visio

ArchiWorking explore l’architecture d’intérieur, l’aménagement intérieur et extérieur, les travaux de rénovation, ainsi que l’immobilier résidentiel et patrimonial. À partir de projets réels, nos articles abordent les choix décoratifs et d’aménagement, les aspects techniques, les démarches administratives, les coûts des travaux et la valorisation du patrimoine.

Ce site prolonge notre blog historique, Pétale de Carreaux, et s’appuie sur ArchiWorking, un média spécialisé en architecture d’intérieur et en aménagement extérieur. Sur la chaîne YouTube, Clara AJMAR, architecte d’intérieur et paysagiste DPLG, et Mathieu REY, architecte d’intérieur et coordinateur de projet, présentent des projets réels, des plans commentés et des études de cas en vidéo. Ils y partagent leurs conseils et leur méthode. Ils accompagnent également des projets au moyen d’études d’aménagement et de conception intérieure ou extérieure proposées en ligne depuis ce site.

Archiworking est une marque déposée sous le n° 5268747. Les textes, photographies, vidéos et éléments graphiques originaux publiés sur ce site sont protégés par le droit d’auteur.

Catégories

Articles récents

  • Turning an 84 m² T2 into a T3 on Plan
  • Fitting Six Functions into an 84 m² T2
  • How to Fit an Entryway, Kitchen, and Laundry Pantry Into 160 Sq Ft
  • How to Remodel a 59 m² One-Bedroom Apartment to Enlarge the Bedroom and Add a Walk-In Closet
  • Creating a Primary Suite: Expand or Reconfigure? 2 Floor Plans Compared with a Clear Method

Catégories

  • FAQ renovation & design
  • Finishes & materials
  • Floor plan design
  • Outdoor & garden design
  • Real estate
  • Renovation & design
  • Tips & tricks

Contact par mail :
info@archiworking.com

Contact par formulaire :
Formulaire de contact

https://archiworking.com/sitemap.xml

  • Mentions légales
  • Politique de confidentialité
  • Consultation avec un architecte d’intérieur en visio

Nos réseaux / Follow Us

All rights reserved ©

X
Besoin d’un avis sur votre aménagement ?
👉 Échanger sur votre projet
Scroll Up